Whitefield School
Refurbishment of Dining Hall and Kitchen area. Installation of new 3 phase Distribution board with designated 3 phase supply to provide separate power to new Dining Hall/Kitchen area. 600×600 direct/indirect lay in type light fittings complete emergency lighting to provide adequate escape route lighting. Installation of a Bain-marie, refrigerated units and Till desks. Cat5e cabling to Till positions. Grade B Fire detection and alarm system to BS 5839-6 comprising of Fire detectors and control indicating equipment. Fire shutters and door closer’s interfaced with Fire Alarm system.
Take a look at some of our other projects.